Constructed in 2022, this three floor concept store was constructed by Macdonald in conjunction with the Breitling UK Team and in partnership with Watches of Switzerland Group.
Constructed from shell and core unit, works included staircase, structural alterations, full M&E installation, floor, wall and ceiling finishes throughout.
Macdonald worked in close partnership with Breitling’s design team and store decorators to install a wide a varied range of display items including a suspended Curtis Kittyhawk from the upper floor ceiling.